• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LAUNCH OF BRIDGE (Contd) - TM-5-5420-280-100185
LAUNCH OF BRIDGE (Contd) - TM-5-5420-280-100187

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  157    158    159    160    161  162  163    164    165    166    167  
TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
45. Depress LAUNCH button (2) to confirm and step into next function.
CAUTION
When deploying bridge across the gap, observe end of
bridge to ensure it does not drive into far shore. If end of
bridge is too low to meet far shore, perform retrieval step
R7 to drive bridge back on pallet until couplings reach
upper roller block on pallet launch boom. Do not drive
bridge back all the way or bridge will uncouple. Refer to
WP 0020 00. Then perform launch step L7 in this Work
Package to raise pallet. Failure to comply may result in
damage to equipment.
While bridge is fully extended on pallet launch boom, do
not attempt to raise or lower bridge to meet far shore by
extending or retracting pallet supporting cylinders prior
to driving bridge back on pallet using retrieval step R7.
Failing to comply may result in damage to pallet frame.
When deploying bridge over gap, ensure that bridge
launch beam does not travel past roller blocks on launch
boom or damage to equipment may result.
46. Depress and hold ACTION 1 button (1) to L16-H-DEPLOY BRIDGE
ACROSS THE GAP, and observe pin wheel drives and winch (3) extend bridge
assembly (4) over gap. Release button (1) when bridge stops. Ramp end of
bridge assembly (4) will be approximately 6-in.(15 cm) past third yellow
mark (5) on pallet frame.
L16-H-Deploy bridge
across the gap
2
3
1
4
RE
HO
RS
FA
0016 00-22






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.