• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LAUNCH OF BRIDGE (Contd) - TM-5-5420-280-100186
LAUNCH OF BRIDGE (Contd) - TM-5-5420-280-100188

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  158    159    160    161    162  163  164    165    166    167    168  
TM 5-5420-280-10
0016 00
LAUNCH OF BRIDGE (Contd)
4
5
47. Depress LAUNCH button (2) to confirm and step into next function.
CAUTION
While bridge is fully extended on pallet launch boom,
do not attempt to lower bridge to meet far shore by
retracting pallet supporting cylinders or damage to pallet
frame will result.
NOTE
Ensure that winch wire rope contacts launch boom rope
guide roller at center with launch boom in lowered
position.
48. Depress ACTION 1 button (1) to L17-A-LOWER FAR SHORE END OF
BRIDGE TO POSITION, and observe ramp ends (6) of bridge assembly (4)
contact ground at far shore, as lower support boom (8) retracts, and launch
boom (7) rotates to down position.
L17-A-Lower far shore end
of bridge to posit
2
1
4
7
8
RE
HO
6
RS
FA
0016 00-23






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.