• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSLOADING PALLET FROM PALLETIZED LOAD SYSTEM TRAILER (PLST) (Contd) - TM-5-5420-280-100269
TRANSLOADING PALLET FROM PALLETIZED LOAD SYSTEM TRAILER (PLST) (Contd) - TM-5-5420-280-100271

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  237    238    239    240    241  242  243    244    245    246    247  
TM 5-5420-280-10
0024 00
TRANSLOADING PALLET FROM PALLETIZED LOAD SYSTEM TRAILER (PLST)
(Contd)
22. Move and hold HOOK ARM switch (1) to LOAD until pallet frame locks (3)
are approximately 4 in. (102 mm) in front of LHS compression frame
locks (2). Release switch (1).
23. Move and hold HOOK ARM switch (1) to LOAD until LHS hook arm is fully
down. Release switch (1).
2
3
1
4 in. (102 mm)
24. Turn POWER switch (8) on RCU (7) to OFF position.
25. Disconnect power cable cannon plug (4) from receptacle (5) and stow RCU (7)
in RCU stowage box (6).
6
5
4
8
7
0024 00-10






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.