• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATION OF CBT BACK-UP POWER FOR BRIDGE LAUNCH OR RETRIEVAL
SLAVE RECEPTACLE, BATTERY BOX LOCATION - TM-5-5420-280-100281

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  247    248    249    250    251  252  253    254    255    256    257  
TM 5-5420-280-10
0026 00
OPERATION OF CBT BACK-UP POWER FOR BRIDGE LAUNCH OR RETRIEVAL
(Contd)
2. Disconnect CBT hydraulic pump hoses (5) and (6) from LHS hydraulic supply
quick-disconnect couplings (3) and (8), located on bracket (1) on late model
CBTs or bracket (10) on early model CBTs.
3. Connect pallet hydraulic hoses (4) and (7) to CBT hydraulic pump hoses (5)
and (6), located adjacent to LHS cabinet assembly (2) on late model CBTs, or at
rear of work platform (9) on early model CBTs.
2
1
8
3
3
7
4
4
6
5
5
10
LHS COUPLINGS,
LATE MODEL CBT
8
7
9
6
LHS COUPLINGS, EARLY MODEL CBT
0026 00-2






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.