• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSFER VALVE, CLOSED POSITION
MAIN POWER SWITCH, ON POSITION

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  254    255    256    257    258  259  260    261    262    263    264  
TM 5-5420-280-10
0027 00
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
CHARGING PALLET BATTERIES USING CBT
NOTE
If pallet electrical system is inoperable or LPU engine
will not crank when operating from pallet batteries
(pallet electrical system is not connected to CBT),
perform steps 1 through 6 to charge pallet batteries.
1. Remove dust cap (3) from NATO slave receptacle (1) at pallet (2) and CBT (5),
and connect NATO slave power cable (4) to each receptacle (1).
1
2
3
4
1
3
5
0027 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.