• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PALLET ELECTRICAL TROUBLESHOOTING SYMPTOM INDEX
PALLET ELECTRICAL TROUBLESHOOTING SYMPTOM INDEX (Contd) - TM-5-5420-280-100351

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  311    312    313    314    315  316  317    318    319    320    321  
TM 5-5420-280-10
0038 00
PALLET ELECTRICAL TROUBLESHOOTING SYMPTOM INDEX (Contd)
MALFUNCTION
TROUBLESHOOTING
NO.
MALFUNCTION
WP-PAGE
18.
RCU will not lock launch boom into
coupling position (L14-A and L15-A) . . . . . . . . . . . . . . . . . . . 0038 00-10
19.
RCU will not lower launch boom (L15-A) . . . . . . . . . . . . . . . 0038 00-10
20.
RCU will not deploy bridge across gap (L16-H) . . . . . . . . . . 0038 00-11
21.
RCU will not lower far-shore end of bridge (L17-A) . . . . . . . 0038 00-11
22.
RCU will not lower near-shore end of bridge (L18-H) . . . . . 0038 00-11
23.
RCU will not raise launch boom to travel position (L20-H) . 0038 00-12
24.
RCU will not tighten winch wire rope (L19-M+H) . . . . . . . . 0038 00-12
25.
RCU will not retract bridge cradle to
travel position (L22-H+M) . . . . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-12
26.
RCU will not raise supporting cylinders (L21-H+M) . . . . . . 0038 00-13
NOTE
Malfunctions 27 through 48 are performed
in bridge retrieval sequence.
27.
RCU will not extend supporting cylinders (R1-M and R2-H) 0038 00-13
28.
RCU will not extend bridge cradle to
retrieval position (R3-H) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-14
29.
RCU will not uncoil winch wire rope (R4-A+H+M) . . . . . . . . 0038 00-14
30.
RCU will not lower launch boom to
retrieval position (R4-A+H+M) . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-14
31.
RCU will not raise near-shore end of bridge
with winch wire rope (R5-H) . . . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-14
32.
RCU will not raise far-shore end of bridge
with launch boom (R6-A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-15
33.
RCU will not retrieve bridge from gap (R7-H) . . . . . . . . . . . 0038 00-15
34.
RCU will not retrieve bridge to pallet (R10-H) . . . . . . . . . . . 0038 00-15
35.
RCU will not lift launch boom into
coupling position (R9-A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-16
36.
RCU will not lower launch boom to
pre-coupling position (R9-A) . . . . . . . . . . . . . . . . . . . . . . . . . . 0038 00-16
37.
RCU will not raise secondary boom (R14-H) . . . . . . . . . . . . . 0038 00-16
0038 00-2






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.