• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Preventive Maintenance Checks and Services (PMCS) for CBT LHS (Contd). - TM-5-5420-280-100386
Preventive Maintenance Checks and Services (PMCS) for CBT LHS (Contd). - TM-5-5420-280-100388

TM-5-5420-280-10 Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  346    347    348    349    350  351  352    353    354    355    356  
TM 5-5420-280-10
0042 00
Preventive Maintenance Checks and Services (PMCS)
for CBT LHS (Contd).
NOT FULLY
ITEM
ITEM TO
INTERVAL
PROCEDURE
MISSION
NO.
CHECK/SERVICE
CAPABLE IF:
9
During
MAIN FRAME
a. Move MAIN FRAME switch to
a. Main frame will
switch (6), and
UNLOAD and release when main frame not operate.
HOOK ARM
is extended fully. Ensure main frame
switch (4)
extends fully. If not, use manual
operation. Refer to WP 0030 00.
b. Move HOOK ARM switch to
b. Hook arm will not
UNLOAD and release when hook arm is operate.
fully extended rearward. If not, use
manual operation. Refer to
WP 0030 00.
6
4
0042 00-7






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.