• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WINCH STOWAGE DRUM UNIT WILL NOT ROTATE - TM-5-5420-280-23-P0100
ELECTRICAL SYSTEM TROUBLESHOOTING SYMPTOM INDEX (Contd)

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  76    77    78    79    80  81  82    83    84    85    86  
TM 5-5420-280-23&P
0007 00
TROUBLESHOOTING PROCEDURES
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
ELECTRICAL SYSTEM TROUBLESHOOTING SYMPTOM INDEX
MALFUNCTION
TROUBLESHOOTING
MALFUNCTION
NO.
WP-PAGE
1.
RCU will not power up using Launch Power Unit (LPU) batteries . .
0008 00-1
2.
RCU will not power up using CBT . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0008 00-2
3.
RCU will not operate hydraulic system using LPU or
CBT batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0008 00-2
NOTE
Malfunctions 4 through 26 are procedures used during
bridge launching and is shown on RCU display screen
steps.
4.
RCU will not extend bridge to operating width (L2-H) . . . . . . . . . . . .
0008 00-3
5.
RCU will not retract winch wire rope (L3-A) . . . . . . . . . . . . . . . . . . . .
0008 00-3
6.
RCU will not extend supporting cylinders (L4-A+M) or (L7-A) . . . . .
0008 00-4
7.
RCU will not deploy bridge half (L5-A) . . . . . . . . . . . . . . . . . . . . . . . .
0008 00-5
8.
RCU will not lower launch boom to launch position (L6-A) . . . . . . . .
0008 00-5
9.
RCU will not move lower bridge half (L8-A) . . . . . . . . . . . . . . . . . . . .
0008 00-6
10.
RCU will not raise secondary boom (L9-H) . . . . . . . . . . . . . . . . . . . . .
0008 00-7
11.
RCU will not move lower bridge half into coupling position (L10-A) .
0008 00-7
12.
RCU will not lower winch wire rope (L11-H) . . . . . . . . . . . . . . . . . . . .
0008 00-8
13.
RCU will not lower launch boom to pre-coupling position (L12-A) . .
0008 00-9
14.
RCU will not deploy lifting cylinders (L14-A) . . . . . . . . . . . . . . . . . . .
0008 00-9
15.
RCU will not lower secondary boom (L13-H) . . . . . . . . . . . . . . . . . . . .
0008 00-10
16.
RCU will not lift launch boom to coupling position (L14-A) . . . . . . . .
0008 00-10
17.
RCU will not lower secondary boom (L13-H) . . . . . . . . . . . . . . . . . . . .
0008 00-11
18.
RCU will not lock launch boom into coupling position (L14-A)
and (L15-A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0008 00-12
19.
RCU will not lower launch boom (L15-A) . . . . . . . . . . . . . . . . . . . . . . .
0008 00-13
20.
RCU will not deploy bridge across gap (L16-H) . . . . . . . . . . . . . . . . . .
0008 00-13
21.
RCU will not lower far-shore end of bridge (L17-A) . . . . . . . . . . . . . .
0008 00-14
22.
RCU will not lower near-shore end of bridge (L18-H) . . . . . . . . . . . . .
0008 00-14
0007 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.