• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ELECTRICAL SYSTEM TROUBLESHOOTING SYMPTOM INDEX
ELECTRICAL SYSTEM TROUBLESHOOTING

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  77    78    79    80    81  82  83    84    85    86    87  
TM 5-5420-280-23&P
0007 00
ELECTRICAL SYSTEM TROUBLESHOOTING SYMPTOM INDEX (Contd)
MALFUNCTION
TROUBLESHOOTING
MALFUNCTION
NO.
WP-PAGE
23.
RCU will not raise launch boom to travel position (L20-H) . . . . . . . .
0008 00-15
24.
RCU will not tighten winch wire rope (L19-M+H) . . . . . . . . . . . . . . .
0008 00-16
25.
RCU will not raise supporting cylinders (L21-H+M) . . . . . . . . . . . . . .
0008 00-17
26.
RCU will not retract bridge cradle to travel position (L22-H+M) . . .
0008 00-17
NOTE
Malfunctions 27 through 48 are procedures used during
bridge retrieval and is shown on RCU display screen
steps.
27.
RCU will not extend supporting cylinders (R1-M) and (R2-H) . . . . . .
0008 00-18
28.
RCU will not extend bridge cradle to retrieval position (R3-H) . . . . .
0008 00-18
29.
RCU will not uncoil winch wire rope (R4-A+H+M) . . . . . . . . . . . . . . .
0008 00-19
30.
RCU will not lower launch boom to retrieval position (R4-A+H+M) .
0008 00-20
31.
RCU will not raise near-shore end of bridge with winch wire rope
(R5-H) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
0008 00-20
32.
RCU will not raise far-shore end of bridge with launch boom (R6-A)
0008 00-21
33.
RCU will not retrieve bridge from gap (R7-H) . . . . . . . . . . . . . . . . . . .
0008 00-22
34.
RCU will not retrieve bridge to pallet (R10-H) . . . . . . . . . . . . . . . . . .
0008 00-22
35.
RCU will not lift launch boom into coupling position (R9-A) . . . . . . .
0008 00-23
36.
RCU will not lower launch boom to pre-coupling position (R9-A) . . .
0008 00-24
37.
RCU will not raise secondary boom (R10-H) . . . . . . . . . . . . . . . . . . . .
0008 00-24
38.
RCU will not lift launch boom (R11-A) . . . . . . . . . . . . . . . . . . . . . . . . .
0008 00-25
39.
RCU will not winch-in wire rope (R12-A) and (R13-A) . . . . . . . . . . . .
0008 00-26
40.
RCU will not retrieve lower bridge half (R13-A) . . . . . . . . . . . . . . . . .
0008 00-27
41.
RCU will not retrieve lower bridge half (R17-H) . . . . . . . . . . . . . . . . .
0008 00-28
42.
RCU will not lower secondary boom (R14-H) . . . . . . . . . . . . . . . . . . . .
0008 00-28
43.
RCU will not raise launch boom to travel position (R16-A) . . . . . . . .
0008 00-29
44.
RCU will not lower winch wire rope (R18-H) . . . . . . . . . . . . . . . . . . . .
0008 00-30
45.
RCU will not lower lifting cylinders (R2-A) . . . . . . . . . . . . . . . . . . . . .
0008 00-31
46.
RCU will not retrieve lower bridge half (R17-H) . . . . . . . . . . . . . . . . .
0008 00-31
47.
RCU will not raise supporting cylinders (R19-H) . . . . . . . . . . . . . . . .
0008 00-32
48.
RCU will not retract bridge to travel position (R21-H) . . . . . . . . . . . .
0008 00-32
END OF WORK PACKAGE
0007 00-2






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.