• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2. Preventive Maintenance Checks and Services for Bridge (Contd). - TM-5-5420-280-23-P0201
LUBRICATION INSTRUCTIONS - TM-5-5420-280-23-P0203

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  171    172    173    174    175  176  177    178    179    180    181  
TM 5-5420-280-23&P
0015 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (Contd)
Table 2. Preventive Maintenance Checks and Services for Bridge (Contd).
ITEM
ITEM TO
EQUIPMENT NOT
INTERVAL
PROCEDURE
NO.
CHECK/SERVICE
READY/AVAILABLE IF:
NOTE
Perform item 43 with bridge on ground,
proceeding counterclockwise.
43
Annual
Bridge assembly
a. Clean all dirt and debris from bridge. Refer
to TM 5-5420-280-10.
b. Retrieve bridge from ground. Refer to
TM 5-5420-280-10.
END OF WORK PACKAGE
0015 00-46






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.