• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVAL - TM-5-5420-280-23-P0338
INSTALLATION - TM-5-5420-280-23-P0340

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  286    287    288    289    290  291  292    293    294    295    296  
TM 5-5420-280-23&P
0041 00
PALLET MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
TRANSPORT ROLLERS REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge halves removed from bridge pallet.
(Table 1, Item 2, WP 0206 00)
Refer to WP 0018 00.
Materials/Parts
Grease (Item 8, WP 0205 00)
Two lockwashers (WP 0152 00)
0041 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.