• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REMOVAL - TM-5-5420-280-23-P0352
PALLET ANCHORING STOWAGE BOX REPLACEMENT

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  298    299    300    301    302  303  304    305    306    307    308  
TM 5-5420-280-23&P
0045 00
PALLET TOOLBOX REPLACEMENT (Contd)
INSTALLATION (Contd)
9.  Install two holddown clamps (27) inside of toolbox (8) with four screws (34), washers (28), and new
locknuts (23).
10.
Install locking plate (18) on stud of locking bracket (19) with wingnut (17).
11.
Install locking bracket (19) on inside of toolbox (8) with four new lockwashers (6) and screws (5).
12.
Install two support brackets (16) on inside of toolbox (8) with eight new lockwashers (6) and
screws (5).
13.
Install toolbox (8) on brackets (4) and (37) of pallet (1) with four washers (3), screws (12), two plates
(9), washers (3), and new locknuts (2).
14.
Install tools in toolbox. Refer to TM 5-5420-280-10.
3
4
2
1
7
8
5
10
6
9
11
6
3
36
12
13
35
37
5
6
33
34
32
14
31
15
16
27
17
18
19
20
29
28
30
25
26
24
21
6
22
23
5
6
END OF WORK PACKAGE
0045 00-3/4 blank






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.