• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WINCH MOUNTING BRACKET PULLEYS REPLACEMENT
WINCH STOWAGE DRUM, MOUNTING BRACKET, AND AXLE UNIT REPLACEMENT

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  342    343    344    345    346  347  348    349    350    351    352  
TM 5-5420-280-23&P
0060 00
WINCH MOUNTING BRACKET PULLEYS REPLACEMENT (Contd)
REMOVAL
NOTE
Both pulleys are removed and installed the same way. Lower pulley
is shown and must be removed first.
1. Remove two snaprings (5) from pin (4).
2. Support pulley (3) and push pin (4) out of winch mounting bracket (1) and pulley (3).
3. Lower pulley (3) and remove from winch mounting bracket (1) and winch wire rope (2).
4. Repeat steps 1 through 3 to remove upper pulley (3).
INSTALLATION
1. If upper pulley (3) was removed, install upper pulley (3) on winch mounting bracket (1) with winch
wire rope (2) in top groove of pulley (3).
NOTE
Apply a light coat of grease to pins at installation.
2. Support pulley (3) and push pin (4) through winch mounting bracket (1) and pulley (3).
3. Install two snaprings (5) on pin (4).
4. Install bottom pulley (3) on winch mounting bracket (1) with pin (4) and two snaprings (5).
5. Connect winch wire rope to launch beam lifting eye and swivel block. Refer to TM 5-5420-280-10.
1
2
5
3
1
4
5
3
END OF WORK PACKAGE
0060 00-2






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.