• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Schematic Drawing - TM-5-5420-280-23-P0425
Schematic Drawing - TM-5-5420-280-23-P0427

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  358    359    360    361    362  363  364    365    366    367    368  
TM 5-5420-280-23&P
0065 00
WINCH ELECTRICAL HARNESS, CONTROL CABLE, AND POWER SUPPLY CABLE REPLACEMENT (Contd)
WINCH ELECTRICAL HARNESS INSTALLATION
NOTE
Install all leads as noted at removal.
1. Connect distributor cable connector No. 61 (1) to signal winch on sensor (23).
2. Connect distributor cable No. 17/1 (15) to reduced pulling force sensor (22).
3. Connect distributor cable No. 17/1 + 61 to distributor cable receptacle (24) on winch electrical
harness (3).
4. Connect force transmitter connector No. 78 (14) to force transmitter receptacle (16).
5. Connect pressure sensor connector No. 63. (13) to pressure sensor (19).
6. Connect rope loop sensor connector No. 7 (12) to rope loop monitoring sensor (21).
7. Install new gasket (7) and connect control control valve rope-out connector No. 6 + 8 (11) to rope-out
control valve solenoid receptacle (17) and tighten screw.
8. Install new gasket (7) and connect pressure control valve connector No. 66 (10) to pressure control
valve solenoid receptacle (18) and tighten screw.
9. Install new gasket (7) and connect proportional valve connector No. 67 (9) to proportional valve
solenoid receptacle (25) and tighten screw.
10. Install new gasket (7) and connect electromagnet motor connector No. 3 (8) to shift valve solenoid
receptacle (20) and tighten screw.
11. Connect winch electrical harness connector No. 100 (4) to electronic box receptacle (5) on electronic
box (6).
12. Install tie-down straps as necessary to secure winch electrical harness (3) and distributor
cable.
0065 00-4






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.