• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION (Contd) - TM-5-5420-280-23-P0475
REMOVAL - TM-5-5420-280-23-P0478

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  400    401    402    403    404  405  406    407    408    409    410  
TM 5-5420-280-23&P
0076 00
PALLET MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
HYDRAULIC PRESSURE RELIEF VALVES AND SOLENOID REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
References
Forward Repair System (FRS)
TM 5-5420-280-10
(Table 1, Item 2, WP 0206 00)
Equipment Condition
Materials/Parts
Bridge halves removed from bridge pallet
Hydraulic oil (Item 12, WP 0205 00)
(rear pressure relief valve only).
Four O-rings (WP 0165 00)
Refer to WP 0018 00.
Four tube seals (WP 0165 00)
0076 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.