• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 6 LAUNCHER MAINTENANCE
REMOVAL - TM-5-5420-280-23-P0518

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  435    436    437    438    439  440  441    442    443    444    445  
TM 5-5420-280-23&P
0082 00
LAUNCHER MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
PIN WHEEL DRIVE ASSEMBLY REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge halves removed for forward pin wheel
(Table 1, Item 2, WP 0206 00)
drive assembly (refer to WP 0018 00) or launch
boom lowered to 0 degrees position for rear pin
Materials/Parts
wheel drive assembly.
Refer to TM 5-5420-280-10.
Cap and plug set (Item 3, WP 0205 00)
0082 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.