• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Schematic Drawing - TM-5-5420-280-23-P0541
INSTALLATION (Contd) - TM-5-5420-280-23-P0543

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  455    456    457    458    459  460  461    462    463    464    465  
TM 5-5420-280-23&P
0088 00
LOWER SUPPORT ROLLER ASSEMBLY REPLACEMENT (Contd)
INSTALLATION
NOTE
Apply a light coat of grease to all parts at installation.
1.
If removed, install two bushings (2) on roller track frame (11).
2.
Attach lifting device and chain or sling to boom roller track assembly (1) and position on launch
boom (10).
3.
Install boom roller track assembly (1) and two spacers (3) on launch boom (10) with two pins (4).
4.
Position tabs (8) on pins (4) between brackets (9) on launch boom (10) and install two retainer
plates (7) with four new lockwashers (5) and screws (6).
1
2
3
11
10
4
5
9
8
6
7
0088 00-4






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.