• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 7. LAUNCH POWER UNIT (LPU) ENGINE MAINTENANCE
REMOVAL - TM-5-5420-280-23-P0594

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  497    498    499    500    501  502  503    504    505    506    507  
TM 5-5420-280-23&P
0101 00
LAUNCH POWER UNIT (LPU) ENGINE
MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
ENGINE FUEL PUMP REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts
Forward Repair System (FRS)
Grease (Item 8, WP 0205 00)
(Table 1, Item 2, WP 0206 00)
Seal washer (WP 0186 00)
Four seal washers (WP 0186 00)
References
Gasket (WP 0186 00)
Two locking tabs (WP 0186 00)
TM 5-5420-280-10
0101 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.