• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Schematic Drawing - TM-5-5420-280-23-P0607
REMOVAL - TM-5-5420-280-23-P0610

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  510    511    512    513    514  515  516    517    518    519    520  
TM 5-5420-280-23&P
0105 00
LAUNCH POWER UNIT (LPU) ENGINE
MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
ENGINE STARTER MOTOR REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Reference
TM 5-5420-280-10
Forward Repair System (FRS)
(Table 1, Item 2, WP 0206 00)
Equipment Condition
Materials/Parts
Bridge halves removed from bridge pallet.
Refer to WP 0018 00.
Two lockwashers (WP 0189 00)
Battery ground cable disconnected.
Lockwasher (WP 0189 00)
Lockwasher (WP 0189 00)
Refer to WP 0113 00.
0105 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.