• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Schematic Drawing - TM-5-5420-280-23-P0625
REMOVAL - TM-5-5420-280-23-P0628

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  525    526    527    528    529  530  531    532    533    534    535  
TM 5-5420-280-23&P
0111 00
LAUNCH POWER UNIT (LPU) ENGINE
MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
ENGINE FUEL INJECTOR REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Materials/Parts
Tools and Special Tools
Forward Repair System (FRS)
Cap and plug set (Item 3, WP 0205 00)
(Table 1, Item 2, WP 0206 00)
Spring washer (WP 0195 00)
Two gaskets (WP 0195 00)
Gasket (WP 0195 00)
0111 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.