• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VALVE ADJUSTMENT
REMOVAL - TM-5-5420-280-23-P0634

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  530    531    532    533    534  535  536    537    538    539    540  
TM 5-5420-280-23&P
0113 00
LAUNCH POWER UNIT (LPU) ENGINE
MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
BATTERY AND CABLES REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge halves removed from bridge pallet.
(Table 1, Item 2, WP 0206 00)
Refer to WP 0018 00.
0113 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.