• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Schematic Drawing - TM-5-5420-280-23-P0643
REMOVAL - TM-5-5420-280-23-P0646

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  540    541    542    543    544  545  546    547    548    549    550  
TM 5-5420-280-23&P
0116 00
LAUNCH POWER UNIT (LPU) ENGINE
MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
ENGINE ASSEMBLY REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Hydraulic pump assembly removed.
(Table 1, Item 2, WP 0206 00)
Refer to WP 0104 00.
Lifting device
Bridge halves removed from bridge pallet.
Chain
Refer to WP 0018 00.
Battery ground cable disconnected.
Materials/Parts
Refer to WP 0113 00.
Engine fuel tank removed.
Twelve locknuts (WP 0201 00)
Refer to WP 0103 00.
Eight lockwashers (WP 0201 00)
Lockwasher (WP 0201 00)
Lockwasher (WP 0201 00)
0116 00-1






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.