CHAPTER 10. SUPPORTING INFORMATION

TM-5-5420-280-23-P Rapidly Emplaced Bridge (REB) NSN: 5420-01-481-3959 Manual
Page Navigation
  583    584    585    586    587  588  589    590    591    592    593  
TM 5-5420-280-23&P
0127 00
LIMITED STORAGE (Contd)
REMOVAL FROM LIMITED STORAGE
Material removed from administrative storage will be:
a. Restored to normal operating conditions.
b. Repaired as required.
c. Returned to normal PMCS schedule using last type service completed as a starting point.
STORAGE OF NEW REB
a. If new REB is placed in storage at either contractor or Government facilities, before being put in
service, the warranty period shall not start until each such REB is withdrawn from that storage, or until
nine months from the date shown on the Materiel Inspection and Receiving Report (DD Form 250);
whichever occurs first.
b. If new REB is placed in contractor storage, the contractor shall maintain and exercise such stored
REB in accordance with the contractor's approved technical manual. Upon removal from storage, and
before delivering the REB to the Government, the contractor shall exercise and perform all PMCS tasks in
accordance with the contractor's approved technical manual.
c. If new REB is placed in Government storage, the Government will exercise stored REB in
accordance with the contractor's approved technical manual. The Government shall notify the contractor
before placing each such REB in storage, and again at the time it is withdrawn. If there are any contractor-
caused retrofits that must be applied to the REB, the storage time does not start until those retrofits are
completed.
END OF WORK PACKAGE