• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY OF INTERMEDIATE SECTION (cont) - TM-55-1945-205-10-2_99
PREPARATION FOR USE -  ASSEMBLY OF INTERMEDIATE SECTION (cont) - TM-55-1945-205-10-2_101

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  67    68    69    70    71  72  73    74    75    76    77  
TM 55-1945-205-10-2 0012 00 4 0012 00 f. Drive the guillotine (7) into the flexor slot (9). Use a sledgehammer. g. Push the chute bolts (6) to the locked position and rotate. 6. Lift the intermediate section (11). a. Install 110 ton shackle (12) on spreader beam (13). {1}  Remove nut (14) and washer (15) from shackle bolt (16). {2}  Remove bolt (16) and washer (17) from shackle (12). 11 16 17 12 15 14 13 18 28 28 28 18 21 22 19 20 23 24 27 26 25







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.