• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR USE -  ASSEMBLY OF INTERMEDIATE SECTION (cont) - TM-55-1945-205-10-2_100
OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY COMBINATION BEACH/SEA END SECTION OPERATION UNDER USUAL CONDITIONS

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  68    69    70    71    72  73  74    75    76    77    78  
TM 55-1945-205-10-2 0012 00 5/6 blank 0012 00 {3}  Align hole in spreader beam (13) with holes in shackle (12). {4}  Install shackle bolt (16) and washer (17) through shackle (12) and spreader beam (13). {5}  Install washer (15) and nut (14) on shackle bolt (16). {6}  Tighten nut (14). 127( This step is typical for both two leg bridle slings. b. Install two leg bridle sling (18) on spreader beam (13). {1}  Remove nut (19) and washer (20) from shackle bolt (21). {2}  Remove bolt (21) and washer (22) from 55 ton shackle (23). {3}  Insert two leg bridle sling master link (24) on shackle (23). {4}  Align holes in shackle (23) with hole on bottom of spreader beam (13). {5}  Install shackle bolt (21) and washer (22) through shackle (23) and spreader beam (13). {6}  Install washer (20) and nut (19) on bolt (21). {7}  Tighten nut (19). 127( This step is typical for all four attachment points. c. Attach spreader beam (13) to intermediate module (11). {1}  Remove shackle pin (25) from 35 ton shackle (26). {2}  Install two leg bridle sling thimble (27) on shackle (26). {3}  Insert shackle (26) through intermediate section lifting lug (28). {4}  Install shackle pin (25) in shackle (26). :,1* d. Using crane, lift intermediate section (11) and place in water. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.