• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation of flexor connectors in left end rakes
Installation of two legged bridle sling on spreader beam

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  73    74    75    76    77  78  79    80    81    82    83  
TM 55-1945-205-10-2 0013 00 5 0013 00 4. Lift the roll-on/roll-off discharge facility combination beach/sea end section (11). a. Install 110 ton shackle (12) on spreader beam (13). {1}  Remove nut (14) and washer (15) from shackle bolt (16). {2}  Remove bolt (16) and washer (17) from shackle (12). {3}  Align hole in spreader beam (13) with holes in shackle (12). {4}  Install shackle bolt (16) and washer (17) through shackle (12) and spreader beam (13). 11 16 17 12 15 14 13 18 28 28 28 18 21 22 19 20 23 24 27 26 25







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.