TM 55-1945-205-10-2
0013 00 6
0013 00
{5} Install washer (15) and nut (14) on shackle bolt (16).
{6} Tighten nut (14).
127(
This step is typical for both two legged bridle slings.
b.
Install two legged bridle sling (18) on spreader beam (13).
{1} Remove nut (19) and washer (20) from shackle bolt (21).
{2} Remove bolt (21) and washer (22) from 55 ton shackle (23).
{3} Insert two legged bridle sling master link (24) on shackle (23).
{4} Align holes in shackle (23) with hole on bottom of spreader beam (13).
{5} Install shackle bolt (21) and washer (22) through shackle (23) and spreader beam (13).
{6} Install washer (20) and nut (19) on bolt (21).
{7} Tighten nut (19).
127(
This step is typical for all four attachment points.
c.
Attach spreader beam (13) to combination beach sea end section (11).
{1} Remove shackle pin (25) from 35 ton shackle (26).
{2} Install two legged bridle sling thimble (27) on shackle (26).
{3} Insert shackle (26) through causeway ferry beach end section lifting lug (28).
{4} Install shackle pin (25) in shackle (26).
:,1*
d.
Using crane, lift causeway ferry beach end section (11) and place in water.
END OF WORK PACKAGE