• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation of two legged bridle sling on spreader beam
ASSEMBLY OF SEGMENT

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  75    76    77    78    79  80  81    82    83    84    85  
TM 55-1945-205-10-2 0014 00 1 0014 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY SEGMENT OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Crowbar (Item 16, WP 0119 00) Hammer, Hand (10 lb Sledge) (Item 29, WP 0119 00) Personnel Required Seaman 88K Equipment Condition Module ISOPAK Disassembled. (WP 0008 00) Operation Of Male And Female Guillotine Connectors. (WP 0009 00) D-Ring/Cloverleaf Fittings And Deck Cleat Fittings Installed. (WP 0010 00) Module String Assembled. (WP 0011 00) Intermediate Section Assembled. (WP 0012 00) PREPARATION FOR USE - ASSEMBLY OF SEGMENT :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 127( The segment consists of one or more side connected intermediate sections. 1. Position intermediate sections (1) so that female connectors align with male connectors on the second intermediate section (2).







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.