• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FULL RRDF SIDE CONFIGURATION
ASSEMBLE A FULL STERN CONFIGURATION

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
TM 55-1945-205-10-2 0015 00 3 0015 00 3. Remove guillotines (2). 4. Push each flexor connector from the left end rake into the corresponding pocket of the right end rake until the guillotines (2) are aligned with the flexor connector slots. 5. Use a crowbar (3) to position flexor connector. 6. Insert guillotines (2). 7. Drive guillotines (2) down into flexor slot using a sledgehammer. 8. Push the chute bolts (1) to the locked position and rotate the chute bolts (1) to the closed position. 2 1 1







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.