• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FORCE OPENING RRDF SIDE CONFIGURATION
FORCE OPENING RRDF SIDE CONFIGURATION (cont) - TM-55-1945-205-10-2_120

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  85    86    87    88    89  90  91    92    93    94    95  
TM 55-1945-205-10-2 0015 00 9 0015 00 :,1* Do not handle ropes/lines by placing hands in bight of the line where it feeds into cleats, etc. Place the hands on top or on the outside so that in an emergency the lines can be released quickly to preclude being pulled into the equipment. Failure to follow these precautions could result in serious injury or death. 1. Maneuver sections together using warping tugs, ropes/lines, flush turn tubes and lift lugs so that the tapered surfaces of male and female shear connectors mate together in general alignment. 2. Rotate chute bolt handles (1) and pull the chute bolts (1) to the unlocked position. 3. Remove guillotines (2). 4. Push each flexor connector from the left end rake into the corresponding pocket of the right end rake until the guillotines (2) are aligned with the flexor connector slots. 5. Use a crowbar (3) to position flexor connector. 3 2 1







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.