• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FORCE OPENING RRDF SIDE CONFIGURATION (cont) - TM-55-1945-205-10-2_120
INSTALLATION OF MOORING BITTS AND QUICK DISCONNECTS (cont)

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  87    88    89    90    91  92  93    94    95    96    97  
TM 55-1945-205-10-2 0016 00 1 0016 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY MOORING BITTS AND QUICK DISCONNECTS OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Crowbar (Item 16, WP 0119 00) Hammer, Hand (10 lb Sledge) (Item 29, WP 0119 00) Forklift Fork Extenders (Item 21, WP 0119 00) Push Rod (Item 45, WP 0119 00) Chain, ½ in. General Purpose (Item 14, WP 0119 00) 5300 lb 4 ft Sling (Green) (Item 50, WP 0119 00) Personnel Required Seaman 88K PREPARATION FOR USE - INSTALLATION OF MOORING BITTS AND QUICK DISCONNECTS REMOVE MOORING BITTS FROM ISO CONTAINER :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 1. Remove straps securing mooring bitt pallets to ISO container. :,1* 2. Using forklift and fork extenders, remove first stack of pallets from ISO container. 3. Remove one fork extender from forklift and install push-pull rod.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.