• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TOWING BRIDLE, TOWING INTERFACE AND TOWING LIGHTS - TM-55-1945-205-10-2_129
INSTALLATION OF TOWING BRIDLE, TOWING INTERFACE AND TOWING LIGHTS (cont) - TM-55-1945-205-10-2_131

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  93    94    95    96    97  98  99    100    101    102    103  
TM 55-1945-205-10-2 0017 00 2 0017 00 2. Attach flexor lifting device (1) to the flexor receiver insert (2). a. Remove nut (3) from bolt (4) and shackle (5) from the flexor lifting device (1). b. Remove nut (6) and bolt (7) from flexor lifting device (1). c. Position flexor lifting device (1) over flexor receiver insert (2). d. Install shackle (5) flexor receiver insert lifting device (1) and flexor receiver insert (2). {1}  Align shackle (5) and flexor lifting device (1). {2}  Install bolt (4) in flexor lifting device (1). {3}  Install nut (3) on bolt (4). {4}  Tighten nut (3) until snug. e. Install bolt (7) in the flexor lifting device (1) and flexor receiver insert (2). {1}  Install nut (6) on bolt (7). {2}  Tighten nut (6) until snug. 3. Install flexor receiver inserts in rake modules. :,1* Be sure no other floating objects are nearby that could come in contact with the soldier while installing the flexor receiver insert. Do not work alone. Failure to observe these precautions could result in death or injury to personnel. a. Attach a tag line to the inner end of the flexor receiver insert (2) to help in guiding it into the flexor pocket on the rake modules. 4 7 1 1 6 3 2 5







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.