• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION OF TOWING BRIDLE, TOWING INTERFACE AND TOWING LIGHTS - TM-55-1945-205-10-2_130
INSTALL TOWING BRIDLE - TM-55-1945-205-10-2_132

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  94    95    96    97    98  99  100    101    102    103    104  
TM 55-1945-205-10-2 0017 00 3 0017 00 :,1* b. Using the forklift adaptor and the flexor lifting device (1), place each flexor receiver insert (2) in the appropriate flexor pocket. c. Install the guillotine bar in the same manner as the flexors to secure to flexor insert receiver (2). (WP 0015 00) :,1* Be sure no other floating objects are nearby that could come in contact with the soldier while removing the lifting device. Do not work alone. Failure to follow these precautions could result in injury or death. 4. Remove the flexor lifting device (1). a. Remove nut (3) from bolt (4). b. Remove nut (6) from bolt (7). c. Remove the flexor lifting device (1) by spreading the halves of the device to clear the shackle cheeks. 5. Repeat procedure for second flexor receiver insert. 6. Stow flexor lifting device (1) in BII container, in original location, for use during disassembly. 4 7 1 1 6 3 2 5







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.