• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FENDERS - TM-55-1945-205-10-2_133
INSTALLATION OF FENDERS (cont) - TM-55-1945-205-10-2_135

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  97    98    99    100    101  102  103    104    105    106    107  
TM 55-1945-205-10-2 0018 00 2 0018 00 :,1* b. Manning the tag lines and using the sealift vessel, place the 6 ft X 12 ft fender in the water. c. Secure the fender nylon lines to the sealift vessel deck fittings. d. Remove tag lines from securing lines. 2. Install remaining cylindrical fenders. 3 FT X 5 FT LIGHTER  FENDER 4 FT X 12 FT LIGHTER  FENDER 5 FT X 10 FT SEALIFT VESSEL FENDER







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.