• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL DUNNAGE MATS (cont) - TM-55-1945-205-10-2_142
GENERATOR CONTAINER

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  106    107    108    109    110  111  112    113    114    115    116  
TM 55-1945-205-10-2 0019 00 7/8 blank 0019 00 12.  Install 1 in. nut (37) to hold Tee bolt in place. 13.  Install Tee bolt (35) into the ISO corner fitting (34). 14.  Turn Tee bolt (35) 1/4 turn, hold against bottom upper surface of corner fitting (34) and finger tighten nut (37). 15.  Using Tee handle (38). tighten nut (37). 16.  Repeat above procedure for remaining corners and dunnage mats. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.