• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL GENERATOR CONTAINER EXHAUST PIPE
GROUND PERSONNEL SHELTER - TM-55-1945-205-10-2_150

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  111    112    113    114    115  116  117    118    119    120    121  
TM 55-1945-205-10-2 0021 00 1 0021 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY PERSONNEL SHELTER OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Materials/Parts Antiseize Compound (Item 3, WP 0120 00) Personnel Required Seaman 88K Equipment Condition Generator Container Installed On RRDF Platform. (WP 0020 00) PREPARATION FOR USE - INSTALLATION OF PERSONNEL SHELTER ON PLATFORM INSTALL PERSONNEL SHELTER ON RRDF :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 127( Personnel shelter must be on the same platform section with generator container. 1. Using crane, lift personnel shelter onto RRDF platform. 2. Position personnel shelter in desired location. 3. Tie personnel shelter at four corners to RRDF platform using tie down straps.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.