• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LIGHT TOWERS - TM-55-1945-205-10-2_155
INSTALLATION OF LIGHT TOWER UNIT (cont) - TM-55-1945-205-10-2_157

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  118    119    120    121    122  123  124    125    126    127    128  
TM 55-1945-205-10-2 0023 00 2 0023 00 4. Remove right forward nut (5) from bolt (6) on trailer drawbar hand crank. 5. Position and install electric wire clamp (7) and trailer wire harness (8) to hand crank bracket with nut (5) and bolt (6). 6. Remove nut (9) and washer (10) on right hand side of trailer drawbar, behind drawbar eye (11). 7. Position wire clamp (12) and trailer light harness on bolt and install nut (9) and washer (10). 8. Remove bolt (13) and nut (14) from lower pulley bracket. 9. Remove lower pulley (15). 10.  Thread cable (16) on pulley (15), replace pulley (15) and secure with nut (14) and bolt (13). 11.  Thread cable (16) around upper pulley (17) and back to lower cable bracket. 12.  Remove quick release pin (18) from lower cable pulley bracket. 13.  Position cable end loop (16) and attach with quick release pin (18). 14.  Connect drawbar eye (11) to towing pintle of fork lift truck. 11 1 3 4 2 17 18 14 15 13 16 6 5 7 10 9 12 8







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.