• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TYPICAL STERN CONFIGURATION MOORING
OPERATE EASY MOORING SYSTEM

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  142    143    144    145    146  147  148    149    150    151    152  
TM 55-1045-205-10-2 0026 00 1 0026 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY EASY MOORING SYSTEM OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Forklift Adaptor (Item 21, WP 0119 00) 5300 lb 6 ft Sling (Green) (Item 51, WP 0119 00) Personnel Required Seaman 88K Equipment Condition EASY Container Installed. (WP 0022 00) OPERATING PROCEDURES - OPERATE EASY MOORING SYSTEM INSTALL EASY MOORING ASSEMBLY :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 1. Unlatch and open container anchor end doors. :,1* Doors must be secured and latched in the open position. Failure to comply could result in injury to personnel. 2. Secure with locking pins and bars to provide access to anchor, buoys and mooring bridle. 3. Unlatch and open container pump side doors.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.