TM 55-1945-205-10-2
0039 00 2
0039 00
3. Recover mooring bridle buoy (2) onto deck of the WT.
4. Tie line between WT and RRDF to take strain off mooring line (3).
5. Remove shackle pin (4) and shackle (5) from mooring bridle buoy chain (6).
6. Set mooring bridle buoy (2) and chain (6) on the deck.
7. Install shackle (5) and pin (4) on end of chain (6).
8. Remove shackle pin (8) and shackle (9) from mooring line (3) and pear link (10).
9. Install the shackle (9) and pin (8) on the end of the mooring line (3).
WARNING
10. Pass the pear link (10) and mooring bridle (11) to RRDF platform.
11. Secure mooring bridle (11) to RRDF platform with a line.
12. Remove mooring bridle two shackle pins (12) and shackles (13) from pear link (10).
8
9
13
12
3
10
6
5
4
11