• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PACK EASY ANCHOR CONTAINER (cont) - TM-55-1945-205-10-2_263
PACK EASY ANCHOR CONTAINER (cont) - TM-55-1945-205-10-2_265

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  216    217    218    219    220  221  222    223    224    225    226  
TM 55-1945-205-10-2 0039 00 14 0039 00 :,1* e. Supporting the weight of the anchor buoy (16), install the retaining pin (48) through container bracket (49) and the buoy retrieval pendant (5). f. Install the quick release pin (47) on the retaining pin (48). g. Remove shackle pin (18) and shackle (19) from bottom of anchor (17). h. Attach anchor buoy line (20) to bottom of anchor (17) with shackle (19) and pin (18). i. Coil excess anchor buoy line on top of anchor (17). 25.  Unlatch and open container mooring box end doors. 26.  Secure doors open with locking bars and pins. 27.  Using forklift, remove the mooring box (50) from the container.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.