• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PACK EASY ANCHOR CONTAINER (cont) - TM-55-1945-205-10-2_265
PACK EASY ANCHOR CONTAINER (cont) - TM-55-1945-205-10-2_267

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  218    219    220    221    222  223  224    225    226    227    228  
TM 55-1945-205-10-2 0039 00 16 0039 00 :,1* 127( The mooring line should be completely dry before placement in the mooring box. 28.   Lay the mooring line (3) in the mooring box (50) leaving approximately 55 feet of mooring line (3) out of the box (50). :,1* 29.   Using forklift and forklift adaptor, lay the anchor chain (14) in the mooring box (50) on top of the mooring line (3). :,1* 30.   Using a forklift, install the mooring box (50) in the container. 31.   Pull anchor chain (14) out anchor end of container. 32.   Double the anchor chain (14) over the anchor (17). 33.   Tie the anchor chain (14) to the anchor crown padeye with #6 thread twine. 34.   Tie the anchor links together in three places with #6 twine to prevent the anchor chain (17) from falling behind the anchor drawer (41). :,1* 35.   Pull the mooring line (3) out through the anchor end of the container. 36.   Tie the mooring line (3) to the upper container frame on the left side in four places with #6 thread twine.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.