• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PERSONNEL SHELTER - TM-55-1945-205-10-2_269
GENERATOR CONTAINER - TM-55-1945-205-10-2_271

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  222    223    224    225    226  227  228    229    230    231    232  
TM 55-1945-205-10-2 0040 00 2 0040 00 2. Detach power cable (1) from personnel shelter power receptacle (2). 3. Remove ground cable. a. Detach ground cable C-Clamp (3) from module ISO fitting (4). b. Remove nut (5), lock washer (6) and flat washer (7) from personnel shelter ground stud (8). c. Remove ground cable (9) from personnel shelter ground stud (8). d. Install flat washer (7), lock washer (6) and nut (5) on ground stud (8). e. Tighten nut (5) securely. 4. Close exterior hinged cover of the electrical shore tie and secure. 5. Remove tiedown straps securing personnel shelter to RRDF platform. 6. Lift personnel shelter from RRDF platform. END OF WORK PACKAGE 3 4 9 8 5 6 7 1 2







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.