• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Remove ground cable
REMOVAL OF GENERATOR CONTAINER - TM-55-1945-205-10-2_272

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  223    224    225    226    227  228  229    230    231    232    233  
TM 55-1945-205-10-2 0041 00 1 0041 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY GENERATOR CONTAINER OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Personnel Required Seaman 88K PREPARATION FOR MOVEMENT - REMOVAL OF GENERATOR CONTAINER REMOVE GENERATOR CONTAINER EXHAUST PIPE :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 1. Loosen flange nut (1).







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.