• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL LOUVER COVERS
FENDERS - TM-55-1945-205-10-2_275

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  226    227    228    229    230  231  232    233    234    235    236  
TM 55-1945-205-10-2 0041 00 4 0041 00 REMOVE CONTAINER FROM PLATFORM 1. Return steps to generator container. a. Lift steps into generator container. b. Attach hook from the turnbuckle on right-hand side of step assembly onto round bar attached to steps. c. Tighten turnbuckle on right-side of step assembly until step assembly is secured. d. Close the generator container door and secure. 2. Remove tiedown straps securing generator container to RRDF platform. :,1* 3. Lift generator container from RRDF platform. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.