• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STOW FEMALE CONNECTORS - TM-55-1945-205-10-2_312
ASSEMBLY OF MODULE ISOPAK - TM-55-1945-205-10-2_314

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  264    265    266    267    268  269  270    271    272    273    274  
TM 55-1945-205-10-2 0053 00 1 0053 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY MODULE ISOPAK OPERATION UNDER USUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Hammer, Hand (10 lb Sledge) (Item 29, WP 0119 00) Ladder (Item 32, WP 0119 00) Personnel Required Seaman 88K PREPARATION FOR MOVEMENT - ASSEMBLY OF MODULE ISOPAK ASSEMBLE END RAKE MODULE ISOPAK :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 1. Lift center module (1) with two leg sling (2).







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.