• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RELEASE BUOYS FROM CONTAINER MOUNTS
DEPLOY EASY ANCHOR (cont) - TM-55-1945-205-10-2_340

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  287    288    289    290    291  292  293    294    295    296    297  
TM 55-1945-205-10-2 0059 00 5 0059 00 DEPLOY EASY ANCHOR WARNING NOTE For the RRDF stern configuration it will be necessary to fake the line along the edge due to the short distance of the bridle. 1.     Remove anchor buoy (12), mooring bridle buoy (14), mooring bridle (15) and pear link (16) from top of anchor and lay out along deck edge in the direction of deployment. NOTE The hydraulic cylinder should reach the end of its travel before drawer wheels contact the end of the trackstop bolts. 2.     Fully extend anchor drawer (5). 15 16 12 14 6 5 7 8







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.