• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DEPLOY EASY ANCHOR (cont) - TM-55-1945-205-10-2_341
ROLL-ON/ROLL-OFF DISCHARGE FACILITY (cont) - TM-55-1945-205-10-2_344

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  290    291    292    293    294  295  296    297    298    299    300  
TM 55-1945-205-10-2 0060 00 1 0060 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY OPERATION UNDER UNUSUAL CONDITIONS INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Crowbar (Item 16, WP 0119 00) Hammer, Hand (10 lb Sledge) (Item 28, WP 0119 00) Personnel Required Seaman 88K Equipment Condition Dunnage Mats Removed And Stowed. (WP 0037 00), (WP 0073 00) Fenders Removed And Stowed. (WP 0042 00), (WP 0068 00), (WP 0069 00), (WP 0070 00), (WP 0071 00) Light Towers Removed And Stowed. (WP 0038 00), (WP 0064 00) PREPARATION FOR TOWING - UNUSUAL ENVIRONMENT/WEATHER PREPARE STERN RAMP FOR TOWING :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. Ensure any ancillary equipment is stowed and secured to the deck. Failure to observe these precautions could result in serious injury or death. 1. Stow and secure dunnage mats on deck, as required. (WP 0037 00) 2. Remove and secure fenders on deck, as required. (WP 0042 00) 3. Stow and secure light towers, as required. (WP 0038 00) 4. Disassemble RRDF intermediate sections as required for a towing configuration.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.