• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECURE STERN RAMP FROM TOWING
SECURE STERN RAMP FROM TOWING (cont) - TM-55-1945-205-10-2_349

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  295    296    297    298    299  300  301    302    303    304    305  
TM 55-1945-205-10-2 0060 00 6 0060 00 2. Disassemble RRDF intermediate sections along sides as required by raising female connector guillotines. (WP 0050 00) 3. Disassemble RRDF intermediate sections on ends as required. a. Release flexor connectors on right end rake (1). {1}  Rotate and pull chute bolts (2) to unlocked position. {2}  Using crowbar (3), lift guillotine plate (4) up from flexor connector slots. b. Stow flexor connectors in left end rake (5). 4 2 3 1 5 3 1 6 4 2







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.