• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECURE STERN RAMP FROM TOWING (cont) - TM-55-1945-205-10-2_348
SECURE STERN RAMP FROM TOWING (cont) - TM-55-1945-205-10-2_350

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  296    297    298    299    300  301  302    303    304    305    306  
TM 55-1945-205-10-2 0060 00 7 0060 00 {1}  Rotate and pull chute bolts (2) to unlocked position. {2}  Using crowbar (3), lift guillotine plate (6) up from flexor connector slots. {3}  Using crowbar (3), move flexor from right end rake (1) into left end rake (5) flexor connector pocket. {4}  Align outboard guillotine slot on flexor with slot in left end rake module. {5}  Install guillotine plates (6) on left end rake (5). {6}  Install guillotine plates (4) on right end rake (1). 4. Position RRDF intermediate sections as required to a stern ramp RRDF configuration using a warping tug. 5. Connect RRDF intermediate sections along sides as required by operating guillotine connectors. (WP 0012 00) 4 1 5 6 STERN RAM P RO LL-O N  / RO LL-O FF DISCHARGE FACILITY







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.