• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
6 FT BY 12 FT FENDERS
PLACEMENT IN CONTAINER

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  316    317    318    319    320  321  322    323    324    325    326  
TM 55-1945-205-10-2 0072 00 1 0072 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY MOORING BITTS STOWAGE INTRODUCTION Scope This work package covers stowage of the mooring bits. Stowage of Mooring Bitts The mooring bitts are stowed three to a pallet, except the top pallet will have a fourth mooring bit stowed on top. The mooring bits are secured with ratchet strap tie downs. Once the mooring bitts are placed on the pallets and secured, they are stacked three pallets high. Stack the pallet with four mooring bitts on top. The pallets are then placed in the 20 ft open end container. The three stacks of pallets are then secured to the container deck tracks with ratchet strap tie downs.The 20 ft open end container accommodates 30 mooring bitts.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.